Studio standup — cycle 1
Studio standup — cycle 1 (activity since last close)
Pulse: Attention needed — nothing is rotting yet, but a lot landed at once and the review queue is deep. No blocked items and no stale gnome PRs crossed threshold this cycle.
Moving
- EPIC2 closed out — a wave of findings and follow-ups landed on
platform: the flagship self-sufficiency re-verdict is scheduled (#99, re-measure 2026-07-19), the un-run email-capture session (EPIC2-11) is carried into the EPIC3 seed (#98), and the management-gnome audit is re-armed for once real cycles fire (#96). - First live crank ran —
crank project kdc(CRANK-02) executed for real and, importantly, its supervision surfaced three concrete correctness findings rather than a green rubber-stamp (see Blocked/attention below). - eaap seeded — the studio’s first
saas/ client engagement brief is filed and deliberately un-greenlit (#85), with phase-0 spikes (requirements, tenancy, providers, UAT probes) filed as schedulable placeholders (#87–#91). - kdc research surface grew — map layer follow-ups filed (kdc#34); first scout discovery produced real signals (Berry Hill / Stack Infrastructure).
Blocked
- No issue carries
blockedpast the 7-day threshold. Nothing is stuck in the deterministic sense this cycle. - Worth a human eye (not threshold-blocked, but load-bearing): three CRANK-02 findings describe live defects in the flagship pipeline —
- #104:
gn_kdc_scouthard-fails on an honest-zero discovery instead of a green no-op (needs an ADR / contract change). - #105:
gn_kdc_recordsis non-idempotent and non-deterministic on stranded signals — it opened four divergent records PRs (kdc#38–41). - #106: self-heal did not observe or absorb those live failures. These are freshly filed (age 0), so they are not yet rotting — flagging early because they undercut the #99 flagship re-verdict.
- #104:
Awaiting review
- 12 open PRs, none stale yet (all age 0), none blocking-by-signal.
- EPIC2-01 LICENSE / copyright sweep — human-authored PRs across six repos:
platform#67,ci#1,project-template#1,theme#1,kdc#29, plusplatform#68 (ledger backfill, #63) andplatform#103 (crank receipt integrity). - Gnome-authored PRs —
www#11 (portal editor output),kdc#37 (scout output), andkdc#38–41 (four records PRs). Per #105, the four records PRs are audit residue — keep at most one and close the rest; that is a sysop close, not mine.
WIP watch
platform carries 29 open non-blocked issues against kdc’s 2. This is expected right after an EPIC close (findings, follow-ups, and seeds all land on the control repo per GD-0005), but the queue is deep. Suggested focus, not a reprioritisation: clear the CRANK-02 correctness trio (#104/#105/#106) and the LICENSE-sweep PRs, since those two clusters gate the flagship re-verdict and unblock reviewer attention. Ordering stays the product manager’s call.